Pakistan is currently classified as a lower middle-income country, with the ambition to become a high-income country. Its policymakers now recognize that no country has transitioned from middle-income to high-income status without generating substantial electricity at affordable rates. The link between energy and prosperity has been well-established since the advent of the Industrial Revolution. The AI Revolution has further reinforced it. Can Pakistan make the transition to a high-income country by developing indigenous energy resources to minimize dependence on expensive imports amid geopolitical uncertainty? 

Pakistan Developing Indigenous Energy Sources


All high-income countries are high-energy countries. Empirical data from the Energy for Growth Hub confirms that high-income, low-energy nations do not exist. A strong positive correlation (R² ≈ 0.83) ties per capita income and electricity consumption globally, meaning economic development requires scaling up energy availability. 


Electricity-Income Correlation. Source: ToddMoss Substack


Recognizing the importance of scaling up electricity generation, Pakistan is undergoing a major transformation in its power sector. Driven by the need to combat a volatile import bill and stabilize its finances, the nation is aggressively shifting away from expensive imported fuels toward a mix grounded in clean energy (solar, hydro, nuclear and wind) and domestic coal. 

Currently, about one-half of the installed base consists of clean and low-carbon sources while the other half relies on fossil fuels. The actual power generation relies more heavily on clean sources. For example, hydropower contributes 36.6% of total generation, while coal generates 26.3% overall, split between local Thar coal and imported coal. Nuclear adds14.3% of the output and  solar and wind account for approximately 4.3% on-grid, though private behind-the-meter installations have surged exponentially in recent years.

To reduce dependence on fossil fuel imports, Pakistan is tapping into the massive lignite coal reserves in the Thar Desert. Projects operating in Block I and Block II utilize domestic mining to provide reliable baseload power without draining foreign exchange reserves.

Major hydropower facilities like the Tarbela 5th Extension and ongoing mega-projects like Dasu and Diamer-Bhasha are expanding generation potential past 11,600+ MW. The Karachi Nuclear Power Plant (KANUPP K-2 and K-3) reactors supply crucial emissions-free base-load power to the southern grid network. Prompted by steep tariff hikes, private rooftop solar installations continue to surge across the industrial, agricultural and household sectors.

Pakistan has no choice but to make electricity cheap and plentiful to increase the productivity of its people. It is the best way for it to transition from a lower middle-income country to a high-income country. 

9 comments:

Suhail Hamid said...

An effective rate of ~105 Rs per unit (inclusive of all taxes, fuel adjustments, and fixed charges) places Pakistan’s commercial electricity among the highest in the world relative to regional peers and global average.

When you convert 105 Rs to US dollars, the effective business rate is roughly $0.37 to $0.38 per kWh (based on the active exchange rate). Here is how that stacks up internationally:
• Global Business Average: The global average business electricity price sits around $0.17 per kWh. Pakistan's commercial rate is more than double the global average.
• Regional Comparison: In South Asia, where average business rates hover around $0.07 to $0.11 per kWh, Pakistan's commercial tariff heavily penalizes local businesses trying to compete internationally.
• The Global Ranking: At ~$0.37/kWh, Pakistan's commercial rate actually exceeds the commercial and industrial rates of heavily taxed European economies like Germany (~$0.18–$0.22/kWh for businesses) and approaches the extreme rates seen in isolated island nations.

Under these circumstances, your standpoint is beyond wishful thinking

Riaz Haq said...

Suhail: “Under these circumstances, your standpoint is beyond wishful thinking”

The real question is this: Will the electricity rates come down as Pakistan reduces fossil fuel import dependence, and relies more heavily on renewables and indigenous sources of energy like Thar coal?

Nayyer Ali said...

Based on google search, industrial electric rates are between Rs 23/kwh off peak and Rs 36 on peak. I can't imagine taxes and fixed charges effectively increase those rates 3x or 4x. Based on market exchange rates power in Pakistan costs about 10-15 cents per kwh, in line with prices in most of the world. There is also the massive shift to solar by households and businesses which effectively lowers average electric prices as daytime power becomes very cheap.

Riaz Haq said...

The effective electricity rate in Pakistan ranges from approximately PKR 22 to over PKR 60 per kWh (unit) for residential consumers, depending on consumption slabs, while business rates average around PKR 39.68 per kWh. Total effective costs can approach or exceed PKR 44 to 60 per unit once all baseline charges, monthly adjustments, and taxes are combined.

Breakdown of Tariff Structure and Slabs (2026)

• Protected Domestic Consumers (≤200 units/month):
• Tier 1 (1–100 units): PKR 10.54 per unit
• Tier 2 (101–200 units): PKR 13.01 per unit
• Note: Lifeline and protected users are largely shielded from base tariff and fuel cost hikes.
• Non-Protected Domestic Consumers (>200 units/month):
• Rates range from PKR 22.44 to PKR 48.84 per unit (and higher upper slabs climbing up to PKR 42.76–60 per unit as you cross higher consumption brackets and add cooling/peak loads).
• Slabs are non-telescopic: crossing a threshold (such as moving from 300 to 301 units) applies the higher rate to the entire volume of consumed units.
• Commercial and Industrial Rates:
• Business and commercial retail rates average roughly PKR 39.68 per kWh or higher depending on peak hours and demand charges.

Taxes, Surcharges, and Adjustments Added to Bills

Electricity bills in Pakistan incorporate multiple statutory levies and variable pass-through mechanisms:
• General Sales Tax (GST): 18% applied to the cumulative energy charges and duties.
• Electricity Duty: A provincial tax of 1% to 1.5% on variable charges.
• Fuel Charges Adjustment (FCA): A monthly floating adjustment reflecting the variance between actual generation fuel costs and reference fuel costs (e.g., ranging from roughly PKR 0.75 to over PKR 2.05+ per unit depending on the month).
• Quarterly Tariff Adjustment (QTA): Periodic capacity and system cost trues-ups spread across quarters (e.g., PKR 0.5194 per unit).
• Financing Cost (FC) Surcharge: Fixed at PKR 0.43 per kWh (plus other FC surcharges).
• TV Fee: A flat monthly fee of PKR 35 for domestic users (PKR 60 for commercial).
• Income Tax / Advance Tax: 7.5% for residential consumers not listed on the FBR Active Taxpayers List once monthly bills reach PKR 25,000 or higher (with varying percentage tiers for commercial/industrial non-filers).
• Fixed Charges: Imposed monthly based on the sanctioned load or tier category, independent of actual consumption units.

Suhail Hamid said...

KANUPP 2 has an installed capacity of 2200MW, and is the cheapest to produce. It's producing only 700-800MW, perhaps the minimum to keep it operational. No plausible reason other than to keep using imported LNG to the maximum to benefit thermal IPPs and making money through LNG imports.

Riaz Haq said...

Suhail: “KANUPP 2 has an installed capacity of 2200MW, and is the cheapest to produce. It's producing only 700-800MW, perhaps the minimum to keep it operational”


The capacity utilization (capacity factor) for KANUPP-2 (K-2) and KANUPP-3 (K-3) at the Karachi Nuclear Power Plant is 78.2% and 85.2% respectively (based on Pakistan Atomic Energy Commission statistics).

Performance Overview

• KANUPP-2 (K-2):
• Installed Capacity: 1,100 MWe gross (1,017 MWe net)
• Net Generation: 6,972.5 GWh
• Capacity Factor: 78.2%
• Availability Factor: 83.2%
• KANUPP-3 (K-3):
• Installed Capacity: 1,100 MWe gross (1,017 MWe net)
• Net Generation: 7,590.6 GWh
• Capacity Factor: 85.2%
• Availability Factor: 90.4%

Riaz Haq said...

KANUPP-2 and KANUPP-3 (Karachi Nuclear Power Plant Units 2 and 3) each feature an installed capacity of 1,100 MWe (roughly 2,200 MWe combined) using Hualong One (HPR1000) pressurized water reactors.

Capacity Utilization & Status

• Combined / Underutilization Reports: Recent operational reporting notes that the Karachi Nuclear Power Generating Station (KNPGS) units have faced dispatch or grid-constraint challenges, operating under capacity (such as being partially underutilized around an 800 MW level for individual units or constrained by national grid demand fluctuations).
• Individual Unit Capacity:
• KANUPP-2 (K-2): Commercial operation began in May 2021 with a net capacity of 1,014–1,100 MWe.
• KANUPP-3 (K-3): Commercial operation began in April 2022 / early 2023 with a net capacity of 1,100 MWe.
• National Contribution: Together, KANUPP-2 and KANUPP-3 form a major pillar of Pakistan's nuclear fleet, which achieved a record net production of 21.7 TWh across all domestic reactors (accounting for about 17% of the commercial grid).


Suhail Hamid said...

Commercial rate of electricity is PKR 105, we're paying it. Out of this, the electricity charge is about PKR 60, rest is taxes, fuel charges etc.

Riaz Haq said...

Suhail: “Commercial rate of electricity is PKR 105, we're paying it. Out of this, the electricity charge is about PKR 60, rest is taxes, fuel charges etc”

Taxes and surcharges on an electricity bill in Pakistan typically add up to roughly 25% to over 35% of the total bill amount, depending on consumption levels, tax-filer status, and provincial duties.

Key Components Contributing to the Total:

• General Sales Tax (GST): Charged at 18% on the energy charges, adjustments, and duties.
• Fuel Price / Charge Adjustment (FPA / FCA): A variable monthly charge reflecting the difference between actual and reference generation fuel costs.
• Surcharges: Include the Financing Cost (FC) Surcharge (e.g., Rs. 0.43 per kWh), Neelum-Jhelum Surcharge, and quarterly tariff adjustments (QTA).
• Additional Taxes:
• Electricity Duty: A provincial levy of 1.5% on variable charges.
• Income / Withholding Tax: Varies based on bill slabs and whether the consumer is on the Active Taxpayers List (filer vs. non-filer) (e.g., non-filers face higher rates or extra taxes like 5%–17%).
• Fixed Fees: PTV License Fee (flat Rs. 35 for domestic users).